Manufacturing feasibility assessment
5. Verdict
Replace free-spinning panels with fixed or low-power tracking modules and weatherproof structure; start with a 50-unit outdoor pilot and regional electrical certification.
Assessment criteria: J. Tanikella · Engine: GPT-5.6 Terra.
