FORM CIBB-02[See Rule 3(2)]

Manufacturing feasibility assessment

Serial No. 2026-07-29-0098Issued: 29 Jul 2026
1.Product
PROJECT NAME: GotaCerta IoT - Smart Gutter Rainwater Harvesting & Automated Drip Irrigation System PROJECT DESCRIPTION: A modular, wall-mounted rainwater harvesting and automated drip irrigation system designed for urban homes in tropical climates (specifically Brazil). It integrates directly into existing roof downspouts. The system features an automatic first-flush diverter (to discard the initial dirty rainwater), a fine mesh filter, a slim 30-Liter UV-resistant HDPE buffer tank, and an IoT-
2.Submitted by
André Zanata
3.Target market
Global
4.Target retail
R$900-1,800

5. Verdict

Viable if limited to non-potable irrigation, reinforced universal mounting, overflow/backflow protection, and certified low-voltage IoT; start with a 50-unit pilot and structural/water-flow testing.

6. Subsystems

  1. 6.1 Downspout interface and first-flush diverterMEDIUM
  2. 6.2 30 L UV-stabilized HDPE buffer tankMEDIUM
  3. 6.3 Wall bracket and structural mountingMEDIUM
  4. 6.4 Filtration and hydraulic routingLOW
  5. 6.5 Pump and drip-irrigation controlMEDIUM
  6. 6.6 IoT controller, sensors and appMEDIUM
  7. 6.7 External low-voltage power systemLOW

7. Bill of materials

Item1001,00010,000
7.1 UV-stabilized 30 L slim HDPE tank with cap and overflowR$75-110R$48-70R$32-45
7.2 Downspout adapters, seals and first-flush diverterR$48-70R$30-44R$19-28
7.3 Fine mesh filter housing and replaceable screenR$30-45R$19-29R$12-18
7.4 12/24 V diaphragm pump, check valve and tubing fittingsR$85-125R$57-84R$38-55
7.5 Wi-Fi controller, moisture/level sensors and sealed enclosureR$95-145R$60-92R$38-58
7.6 Certified external low-voltage power supply and cableR$42-65R$27-42R$17-27
7.7 Drip line, emitters, valves and garden connectorsR$58-90R$37-57R$24-36
7.8 Powder-coated wall bracket, anchors and fastenersR$52-78R$33-50R$21-32
7.9 Packaging, printed install guide and labelsR$38-58R$26-39R$17-25
7.10 TOOLING (one-time)R$220,000-480,000 for tank blow-mould tooling, bracket dies/jigs, injection tools, leak-test fixtures and packaging tooling.

At 10,000 units, tooling adds roughly R$22-48/unit, or 2-5% of the R$900 entry retail. Estimated 10k BOM is R$218-324/unit, below 40% of entry retail; assembly, freight, channel margin and warranty still need room.

8. Gates to clear

  1. 8.1 [DFM]

    The tank must survive UV, overflow and a 35 kg wall load, while downspouts vary wildly. Universal fit is where tidy CAD gets mugged by real houses.

    Path: Create 75 mm, 100 mm and rectangular adapter families; FEA the bracket for 2x filled load; validate on masonry, concrete and stud-wall mock-ups; run 500-cycle fill/drain, UV and leak tests with a Brazilian plastics moulder.

  2. 8.2 [Certification]

    A radio-connected, wet-location product cannot freeload on a generic ESP32 listing; Brazil needs ANATEL treatment, and export adds CE/FCC work.

    Path: For Brazil, use an ANATEL-approved Wi-Fi module, submit the final radio product through an ANATEL-accredited test laboratory and use an INMETRO-compliant external PSU where applicable. For EU/US releases, complete CE RED/EMC/RoHS and FCC Part 15 testing after the enclosure and antenna are frozen.

  3. 8.3 [Tooling]

    A custom slim tank and multiple adapter variants can chew through the entry-price margin before the first raindrop is harvested.

    Path: Pilot with rotationally moulded or stock tanks and CNC/printed adapters at 100 units; freeze the highest-volume geometry after field data; move to extrusion blow moulding and injection-moulded adapters only after a 3,000-5,000 unit committed forecast.

9. Prototype sequence

  1. 9.1Build 20 functional units from stock 30 L tanks, ANATEL-capable Wi-Fi modules, off-the-shelf pumps and modular downspout adapters.Proves water flow, first-flush behavior, app control and actual installation friction before expensive tank tooling.
  2. 9.2Install units across masonry, concrete and light-frame walls in Brazilian rainy-climate homes for one wet season.Measures leaks, bracket loads, filter clogging, mosquito sealing, pump dry-run events and real water yield.
  3. 9.3Revise around three adapter sizes, a serviceable filter cartridge, manual watering override and a rated external PSU.These are required changes for installation coverage, maintainability and a credible certification path.
  4. 9.4Run pre-compliance radio/EMC testing, ingress and UV exposure testing, plus 500 fill/drain and bracket-load cycles.Catches the expensive failures before ANATEL, CE RED and FCC submissions lock the design.
  5. 9.5Execute a 100-unit pilot build with production-intent bracket, tank geometry and test fixtures.Establishes assembly time, leak-test yield, field reliability and the volume case for production tooling.

Assessment criteria: J. Tanikella · Engine: GPT-5.6 Terra.

This is a system generated assessment issued on the basis of the information furnished above. It is produced by an automated model and may be incomplete, inaccurate, or fabricated. It is not a substitute for a DFM review by a manufacturer, nor for independent engineering, legal, or manufacturing due diligence.